Fig. 7From: Monitoring of the vibration induced on the Arno masonry embankment wall by the conservation works after the May 25, 2016 riverbank landslideSpectral analysis of the Z, NS and EW components of the traces recorded by LGT103 station during i) piling work, ii) Embankment consolidation, i.e., parapet breakdown, excavation, embankment arrangement and foot wall consolidation (Arno river side), and iii) ordinary activities, i.e., backfill and restoring of the original condition, ordinary construction activitiesBack to article page