Fig. 5From: A rationale for effective post-fire debris flow mitigation within forested terrainThe flow path of the Pilot Ridge debris flow where it crossed Forest Road 1S66. Note the levees of soil and transported trees left on the road and the undermining of the roadbed by the debris flow’s passageBack to article page