Table 9 Factor loadings

From: Disaster preparedness for metro projects: a social-cognitive perspective of Pakistan

Items Agreeableness towards project Disaster preparedness individual level Disaster preparedness state level Post completion adversities Post completion perception Project utilization
AP1 0.704      
AP2 0.721      
AP3 0.778      
AP4 0.706      
AP5 0.930      
DP2    0.749    
DPI1   0.885     
DPI2   0.824     
DPI3   0.735     
DPI4   0.750     
DPI5   0.935     
DPI6   0.799     
DPI7   0.713     
DPI8   0.714     
DPI9   0.733     
DPS1    0.728    
DPS3    0.796    
DPS4    0.841    
DPS5    0.727    
DPS6    0.934    
PCA1     0.772   
PCA2     0.729   
PCA3     0.747   
PCA4     0.729   
PCP1      0.822  
PCP2      0.771  
PCP3      0.712  
PCP4      0.762  
PCP5      0.913  
PCP6      0.897  
PCP7      0.869  
PCP8      0.996  
PCP9      0.997  
PU1       0.881
PU2       0.946
  1. AP Agreeableness Towards Project, DPI Disaster Preparedness Individual Level, DPS Disaster Preparedness State Level, PCA Post Completion Adversities, PCP Post Completion Perception, PU Project Utilization.