From: Effect of climate change on earthworks of infrastructure: statistical evaluation of the cause of dike pavement cracks
Catchment area
[-]
Danube
Tisza
No. of cracks
pc
1158
829
Length of cracked pavement
m
31,960
247,704
Length of paved dikes
km
360
890
Specific number of cracks
pc/km
3.22
0.93
Specific cracks
m/km
8878
278.32
Average dam height
3.20
3.78